Construct the PATTERSON FARMS PHASE 4 as shown in the drawings and specifications. The project will consist of 4,100 ft of DIP water main including services, Manhole, fittings, valves, flushing valves, installing future connections, etc. The Project also includes 2,800 LF of gravity sewer main including setting man-holes, installing laterals, testing, ect. The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project. The cost of any permits required for erosion control and land disturbing will be borne by the Owner. The Contractor will be responsible for the cost of any other permits or licenses required to complete the work. The Contractor will complete all necessary clean-up and restoration work to include filling, finish grading, grassing, landscaping, pavement repairs, driveway repairs, culvert repairs, drainage ditch restoration and other necessary restoration activities such that post construction conditions are EQUAL TO OR BETTER than those conditions that existed prior to any construction activity occurring.