This project might include all typical construction trades, and will definitely require the following Trades: Mechanical, Electrical, Plumbing, Demolition, Painting. The services will consist of pre-construction and construction services which may proceed concurrently. Pre-construction services include cost estimating, constructability analysis and scheduling and phasing of the work. The CM will assist the School District and the Project Engineer in finalizing the phasing and scheduling of the work and value engineering of the Project. Equipment installation is to be scheduled as soon as practical for the facility, when campus is mostly vacant, possibly over our Christmas Break (12/21/24-1/5/25), or our Spring Break (3/29/25-4/6/25), or next Summer (starting 5/29/25), with Substantial Completion to occur as soon as possible, and with date to be determined (TBD) during preconstruction phase.