105-01 CONSTRUCTION STAKES, LINES AND GRADES (1) LS; 108-03 CPM PROJECT SCHEDULE (1) LS; 109-10.01 TRAINEE 5,600.000 HOUR; 201-01 CLEARING AND GRUBBING (1) LS; 202-01 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (1) LS; 203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) 60,035.000 C.Y.; 203-02.01 BORROW EXCAVATION (GRADED SOLID ROCK) 17,600.000 TON; 203-03 BORROW EXCAVATION (UNCLASSIFIED) 105,035.000 C.Y.; 203-03.15 BORROW EXCAVATION (CLAY) 170.000 C.Y.; 203-04 PLACING AND SPREADING TOPSOIL 11,295.000 C.Y.; 203-05 UNDERCUTTING 9,835.000 C.Y.; 203-06 WATER 365.000 M.G.; 203-08 CHANNEL EXCAVATION (UNCLASSIFIED) 360.000 C.Y.; 204-06.01 FLOWABLE FILL (GENERAL) 40.000 C.Y.; 209-02.07 18" TEMPORARY SLOPE DRAIN 1,575.000 L.F.; 209-05 SEDIMENT REMOVAL 1,882.000 C.Y.; 209-08.02 TEMPORARY SILT FENCE (WITH BACKING) 16,428.000 L.F.; 209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING) 53,415.000 L.F.; 209-08.07 ROCK CHECK DAM 71.000 EACH...