Supply and deliver a new 480V MCC and Switchgear. The overall dimensions of the new MCC/Switchgear shall fit within the existing limited space as specified in the specifications included in this ITB (collectively, Goods). The selected contractor will also perform related commissioning and startup services consisting of commissioning and startup for the motor control centers and switchgear, field inspections, certifying proper installation, and training of District personnel (collectively, Special Services). A single manufacturer shall be responsible for supplying the described equipment with all accessories and appurtenances, including but not necessarily limited to, parameter setting software. District will enter into a separate contract with a contractor to install the Goods (Installing Contractor).