A. Scope of demolition and removal work is shown on drawings and specified in Section 02 4100. B. Scope of alterations work is indicated on drawings. C. Replacing existing DDC controls in the following buildings: Huntington Hall, Hunt Memorial Library, Patton Hall, Peabody Hall, Warner Robins Center, and Oneal Veterinary Science Building . D. The project shall be sequenced such that each building has limited disruption of air conditioning. E. Perform electrical work in support of demolition of existing HVAC and installation of new HVAC systems. F. The buildings shall be OCCUPIED by the Owner during the construction. G. Protect existing floors, finishes and building during the HVAC upgrades. H. Make other improvements as noted on the Drawings. I. the Owner intends to continue to occupy adjacent portions of the existing building during the entire construction period.