1. Overview: Rockdale County desires to construct Wheeler Park South site construction. 2. Description: The successful bidder’s turn-key bid proposal shall include all costs for grading, surface preparation, materials, grass seed and straw, drainage, erosion control, septic system removal and disposal, tree removal only, upgrades to existing detention pond, forced main and utilities, as listed per the attached civil drawings. Contractor to provide all equipment necessary to complete the site improvements per the civil drawings. The contractor will obtain the necessary construction permits for the project. All county fees will be waived. 3. Site All sitework to be completed by a Contractor. Sidewalk location and installation must be coordinated with county representative. All utilities to be prepped and stubbed up above grade for others per plans. 4. Restrooms Contractor to provide GAB and utility prep only for (2) restroom buildings, utilities to include, water and sewer. Connect 4- unit restroom to sewer at splash pad pump room. See exhibit #5 and exhibit #6 for more specifications. Installation of modular restroom buildings to be by others.