1. Identify and troubleshoot the open conditions and areas of deterioration throughout the coated modified roof section. 2. Clean and prepare the areas to be repaired. a) Verify areas to be repaired are sufficiently cleaned and dried prior to repairs. b) Remove loose/peeling coating prior to repairing the area. 3. Apply a 3-course repairs to any open seams/deteriorated coating. a) For horizontal/low slope areas, fill any voids in the cap sheet and coating with White-Knight Plus. Position Grip Polyester Soft to roll out, apply coating at 4.0 gal/100 sq. ft. extending 4 in. on each side of lap to where the reinforcement is to be applied. Immediately roll reinforcement into the coating and completely saturate surface ensuring full encapsulation of fabric without pinholes, voids, openings or vertical fibers. Apply an additional White-Knight Plus extending 4” past the encapsulated Grip Polyester Soft on all sides ensuring complete coverage throughout. b) For vertical seams, trowel a layer of Silver-Flash to the open area extending at least 3" past the open area in all directions. Embed Gar-Mesh then apply additional Silver-Flash to sufficiently encapsulate the scrim. 4. Allowance of up to 300 linear feet of total 3 course repairs. a) Allowance for 10gal of White Knight Plus b) Allowance for 300' of 6" Grip Polyester Soft c) Allowance for 5gal of Silver-Flash d) Allowance for 150' of 6" GarMesh