A. Demolition (raze/ tear down) of all structure(s), to include removal of the structure(s), removal of all debris, weeds, rank vegetation, driveways, slabs, foundation walls, impervious surfaces, and fences. Sever and seal electrical, gas, water, sewer, and telephone utility mains per the Utility Companies Directives, also to fill open wells, removal/crushing/fill-in of septic tanks, underground fuel tanks, etc. on property(ies) to South Carolina Department of Health and Environmental Control standards. Demolition of the structure shall be in accordance with all applicable regulations for the properties located at: o 102 Fortner Avenue, Greenville, SC Tax Map Number 0250.00-02-011.05. Asbestos was not detected on the property and air monitoring will not be required for asbestos abatement. The GIS Map and the Asbestos Report are attached. B. Leveling and grading of entire site and seeding the property with a mixture of grass seed, specifications found in Section 2.7 “CLEAN-UP” of this document. C. Construction of any temporary passageways meeting the requirements of these specifications may be required.