This project approved for ADOT Transportation Alternatives (TA) Program funding for the installation of 5,310 linear feet of 5- foot wide sidewalk, vertical curb and gutter, 16 ADA-accessible sidewalk ramps, and 10 sidewalk scuppers and concrete spillways on the south side of Battaglia Road adjacent to the existing drainage channel. The, but other improvement items may be identified through the project development. Scope of Work: The consultant shall prepare a final scoping letter and design package for this sidewalk improvement project. The consultant will be responsible for all design elements with the exception of any sidewalk construction design and technical and clearances support documentation , which ADOT will perform in-house. Project deliverables include: ● Scoping Letter (Draft & Final) ● Stage III ● Stage IV ● Stage V (Final PS&E)