MDM Construction Group, Inc. is seeking proposals from qualified and certified DBE, MBE, UDBE and WBE Contracting and Supplier firms. For the following areas: Traffic Control; Clear and Grub; HMA paving; Concrete; Precast Structures; Erosion Control; Bollards; Fencing; Electrical; Boring; Generator; Pumps and Controls and all other scopes of work pertaining to this project. The project generally consists of the following items: Temporary sewer bypass for the duration of construction. Installation of a 50-foot, 21-inch sewer line and a 48-inch new manhole connecting the lift station to the existing sanitary sewer collection system. Construction of the lift station wet well and valve vault and drop manhole connection. Installation of new lift station pumps and controls. Installation of a 6-inch, approximately 3000-foot new force main and connection to the existing 12-inch force mains. Site grading and improvements, including but not limited to fence installation, water, and the construction of a concrete pad for control panels and emergency generator placement. Site electrical improvements, including lighting and security. Installation of an emergency generator. Removal and reinstallation of fencing and restoration of disturbed areas. Auger boring under the Spokane County Railroad spur and pipe casing installation.