• All asphaltic materials shall conform to the requirements and specifications of the Georgia Department of Transportation (GDOT). • Furnish and install GDOT 9.5 mm TPI mix for both the binder and surface course unless otherwise specified. • Contractor shall be responsible for trucking off of all spoils created by milling operations. • Contractor must apply bituminous tack to existing surface prior to repaving, at a rate of 0.070 gallons per square yard. • Hot mix asphalt pavement and mixtures shall conform to the type, thickness, and gradation shown in the contract documents, unless otherwise specified. • Contractor must sweep all road edges prior to paving. • Contractor is responsible for all traffic control. • Contractor shall allow local traffic on roadway segments at all times.