• All fiber Shall be in 2” conduit between buildings. • From building to building we prefer directional bores, If feasible. • Need 12 strands of indoor/outdoor 10km single mode fiber. • From Baseball Fieldhouse IDF to Band Storage Building. • From Band Storage Building to Track Finish Line Tower. • From Band Storage Building to Soccer Press Box • From Band Storage Building to South End of Stadium IDF • From Band Storage Building to Board of Education MDF • Need to have a Quazite box at each location before entering the building. • All fibers will be fusion spliced with lC fiber ends. • All fibers will be terminated in a wall mount fiber enclosure. • Track Finish Line Tower, Band Storage and Soccer Press Box fiber termination location to be determined. If no conduit path contractor will have to provide.