The Work consists of coordinating, scheduling, incorporating, and providing all equipment, materials and labor necessary to: 1. Demolish an existing wellhouse and construct a new wellhouse in place. Wellhouse shall consist of 22’-0” x 34’-8” (nominal) CMU building constructed on shall reinforced concrete footing, with wood framed roof having a metal deck. 2. Water distribution system piping improvements including, 2,422 LF of 2 IN DR-9 CTS HDPE water line loop, 535 LF of 1 IN DR-9 CTS HDPE water line replacement, 1,331 LF of 1 IN DR-9 CTS HDPE water line looping and replacement of various isolation valves. 3. Installation of new pressure reducing valve assembly to interconnect two discrete distribution systems to afford the implementation of the proposed water system improvements 4. Construction of two (2) duplex submersible grinder pump stations and 14,859 LF of 4 IN DR-11 IPS HDPE force main for the conveyance of all wastewater from the park to the City of Sullivan 5. Implementation of a chemical feed process for odor control 6. Installation of underground primary circuit from the Crawford Electric Cooperative infrastructure on the southern extent of the City of Sullivan, to the Lift Station No. 2 site. 7. Closure of the existing Meramec WWTF site 8. Replacement of the valve vault, including all process piping and valves, for the existing campground lift station.