This work shall include furnishing all labor, materials, equipment, and other incidentals necessary for installation of soldier pile wall within Hillside Court including excavation, furnishing and drilling of soldier piles, installation of treated timber lagging, and granular backfill; full pavement rehabilitation of Hillside Court and Pavement extension of Waltonian terrace including hot-mix asphalt removal; pulverization of existing pavement; base course grading, placement of hot-mix asphalt binder and surface course; driveway removal and replacement; driveway addition on Waltonian Terrace; and parkway restoration in accordance with the design plans, project specifications and contract documents. Scope of work also includes removal of existing stairs, which will be redesigned and built by Contractor.