The CONTRACTOR shall furnish all labor, equipment, tools, goods, materials, and incidentals necessary to install the following items and other system appurtenances as specified. Work includes, but is not limited to mobilization/demobilization; temporary facilities; erosion and sediment control measure installation and maintenance; drilling a 375-foot deep well for installation of a vertical impressed current deep anode groundbed; installation of a District-supplied stand to house a new rectifier, junction box, meter base, and breaker panel; trenching between vault P-10 and rectifier stand; trenching between rectifier stand and District-provided transformer; installation and routing of a negative header cable, thermite welded to piping equipment within vault P-10; commissioning and testing of installed cathodic protection equipment.