1.2.1. Conduit: 1.2.1.1. Install 2” EMT conduit from ER/MDF to 1st Floor TR/IDF. 1.2.1.2. Install 2” EMT conduit from ER/MDF to 2nd Floor TR/IDF. 1.2.1.3. Install 1” EMT conduit from ER/MDF to 1st Floor TR/IDF. 1.2.1.4. Install 1” EMT conduit from 1st Floor TR/IDF to 2nd Floor TR/IDF. 1.2.2. ER/MDF 1.2.2.1. Install 1 - Fire Retardant Intumescent Black Latex Painted A/C Grade Plywood backboard. Backboard minimum size shall be 24" width and 48" length. 1.2.2.2. Install 1 - Middle Atlantic SFR-12-18 Wall Mount Rack. 1.2.2.3. Install 1 - Chatsworth 40158-020 Main Grounding Bus Bar onto backboard. 1.2.2.4. Install 2 - Leviton 5R1UH-S03 R/M fiber enclosures. Include 2 - 5F100-2LL SM Fiber Panels in one, and 2 - 5F100-2LC MM Fiber Panels in the other. 1.2.2.5. Terminate existing SM and MM fiber into new rack using Leviton FSSSD-60 splice sleeves, Leviton UPPLC-KIT SM pigtails, and Leviton 54PLC-KIT MM pigtails. Place pigtails into a Leviton T5PLS-24F splice tray. 1.2.2.6. Install a Leviton 41D6A-1F4 wall mount 110 block, including Leviton 69104-IDC C-4 Clips. 1.2.3. 1st Floor TR/IDF 1.2.3.1. Install 1 - Fire Retardant Intumescent Black Latex Painted A/C Grade Plywood backboard. Backboard minimum size shall be 24" width and 48" length. 1.2.3.2. Install 1 - Middle Atlantic SFR-12-18 Wall Mount Rack. 1.2.3.3. Install 1 - Chatsworth 40158-012 Secondary Grounding Bus Bar onto backboard. 1.2.3.4. Run #6 Green THHN from Secondary Grounding Bar into AC Panel in the same closet as TR. Run a second #6 Green THHN from Secondary Grounding Bar to Main Ground Bar through 1” EMT conduit. 1.2.3.5. Install 1 - Leviton 5R1UH-S03 R/M fiber enclosures. Include 1 - 5F100-2LC MM Fiber Panel. 1.2.3.6. Install 1 - 49455-48B 48 Port Patch Panel. Include 1 - Leviton 49005-CMB Cable Management Bar and 1 - Leviton 49005-CMC Cable Management Clip.