A bid bond is required to be submitted with the bid. There will be a mandatory pre-bid meeting held on October 4, 2024 at 10:30AM at the following location: Winfield Correctional Facility 1806 Pinecrest Circle Winfield, KS 67156 Boilers shall be Hydronic hot water. Locations are: A Dorm basement with two (2) 16’9” X 21’6” & Room B Dorm, first floor with two (2) 11’1” X 11”9” Dimensions C Dorm, first floor with two (2) 22’3” X 19’7” Admin building mechanical room with one (1) 23’ X 11’8” Gym basement mechanical room with (1) 24’10” X 8’10” Pinecrest basement with one (1) 19’2” X 17’3” Disconnect and remove existing boiler and accessories as needed. o Boiler o Hot water piping as needed o PVC Flue piping as needed o Gas piping as needed o Electrical as needed Provide and install (1) heating hot water high efficient condensing boiler o Approximate size - 1,000,000 btu/hr input, 850,000 btu/hr output o Natural gas fired Reconnect hot water piping. Reconnect gas piping. Reconnect PVC flue piping. Reconnect electrical. Startup and technical checkout of new system