The project consists of the bridge crossing the White River within the Stewart Road SE, Butte Avenue SE, 140th Avenue Court E, and 140th Avenue E right-of-way and easements in the cities of Sumner and Pacific, and Pierce County. This work includes the demolition of the existing bridge structure; demolition of existing building structures; construction of a new, widened bridge structure with shared use path; removal and reconstruction of the east side levee; storm drainage piping, structures, and vaults; new water mains, service lines, and appurtenances; illumination; a utility trench consisting of new conduits, and vaults for spare conduits; and the installation of utility hangers between the girders of the new bridge. The work includes but is not limited to; clearing and grubbing, removal of unsuitable materials, structural excavation, roadway excavation, dewatering, utility relocation, levee relocation, grading, storm drainage installation, water line installation, retaining walls, paving, curb and gutter, street lighting, signalization, channelization, signing and surfacing.