Work to be done shall consist of the construction of a permanent 550 GPM deep well and furnishing all products and performing all labor necessary to construct a chemical feed building described herein. In general, construction consists of the installation of a new deep well to the depth and diameter as required in the Construction Drawings and Technical Specifications. In general, construction shall include a chemical feed building, drilling a 26” Dia. Hole, installing 20” permanent casing, 75-hp Vertical Turbine Pump, motor, valves, yard piping, painting, videotaping, logging and performing a 24-hour pump test, site work, electrical and all other appurtenances necessary to complete the work. Minimum depth is expected to be +/- 520 feet.