The City of Palm Coast is seeking bids from qualified Contractors for the construction of the extension of Matanzas Woods Parkway as a multilane roadway from west of US 1 to west of the existing Florida East Coast (FEC) railroad including a bridge spanning the railroad. The project is approximately one mile in length. Construction improvements will include roadway construction for a multilane roadway, sidewalk construction, landscaping, signing and pavement markings, and utility mains installation. Drainage improvements will include grading, drainage structures, pipes, and construction of pond(s). Lighting will be constructed along the roadway and proposed bridge. Lighting poles will be installed by FPL. Traffic signal work will include the construction of one signalized intersection with mast arms at the intersection of Matanzas Village Avenue and Matanzas Woods Parkway and ITS connectivity. Major structural work will include the construction of an overpass spanning the existing FEC railroad. The overhead electric transmission lines owned by FPL and within an FPL easement will need to be relocated by FPL as part of this project.