1. It is the Asbestos Contractor's responsibility to inspect the site and confirm scope, condition, and quantities prior to the submission of his/her bid package. It is also the Asbestos Contractor’s responsibility to review the demolition drawings, notes, and phasing configurations. 2. The asbestos Contractor must comply with DEP 310 CMR 7.15 and DLS 454 CMR 28 regulations. 3. Remove and dispose as ACM of all types/layers of flooring materials listed above, including but not limited to vinyl floor tiles, carpet, resilient baseboard, stair treads, transition strips, leveling compound, leveler, plywood, and mastic. Removal must be done which leave substrate smooth (in similar condition to that which existed prior to Mastic application). Use of Chemicals will not be permitted. The Contractor shall grind the floor to remove all mastic. 4. Disconnect, remove and dispose of as ACM of sinks. 5. Disconnect, remove and dispose of as ACM of round light fixture...