Section 01 COMMON ITEMS 1 025323 1.000 LS MOBILIZATION / 2 070626 1.000 LS MOBILIZATION (DBE) / 3 025324 1.000 LS TRAFFIC CONTROL / 4 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 5 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 6 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART Section 01 Total $4,030.00 Section 02 ASPHALT SURFACING ITEMS 7 060241 10867.000 TON HMA OVERLAY (SR-12.5A) (PG 70-28) / 8 010256 28.000 TON EMULSIFIED ASPHALT (SS-1HP) / 9 080465 1.000 TON $250.000 $250.00 MATERIAL FOR HMA PATCHING (SET PRICE) / 10 081699 10867.000 TON QUALITY CONTROL TESTING (HMA) / 11 070912 441.400 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) / 12 000063 1.000 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 13 000062 1.000 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 14 011750 1.000 EACH $50.000 $50.00 ASPHALT CORE (SET PRICE) / 15 011764 133168.000 SQYD MILLING / 16 080672 113.000 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) / 17 010814 647.000 CUYD COVER MATERIAL (CM-L-1) / 18 012809 441.400 STA. MANIPULATION (CHIP SEAL) / 19 010112 1.000 MGAL $40.000 $40.00 WATER (FLEXIBLE PAVEMENT) (SET PRICE) / Section 02 Total $342.00