Section 01 COMMON ITEMS 1 020100 1.000 LS CONTRACTOR CONSTRUCTION STAKING / 2 025323 1.000 LS MOBILIZATION / 3 025200 1.000 LS REMOVAL OF EXISTING STRUCTURES / 4 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / Section 01 Total $30.00 Section 02 ROAD ITEMS 5 025361 1.000 LS CLEARING AND GRUBBING / 6 030189 19960.000 SQYD SALVAGED TOPSOIL / 7 012410 919.000 CUYD COMMON EXCAVATION (RURAL SMALL) / 8 012420 22.000 CUYD ROCK EXCAVATION / 9 012415 7515.000 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 10 012317 6577.000 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 11 071533 17.000 CUYD FLY ASH SLURRY GROUT (LOW STRENGTH) / 12 010114 1.000 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 13 023447 331.250 LNFT GUARDRAIL, STEEL PLATE / 14 023456 1025.000 LNFT GUARDRAIL, STEEL PLATE (MGS) / 15 023411 1.000 EACH GUARDRAIL END TERMINAL (SKT) / 16 023454 26.250 LNFT GUARDRAIL, REMOVAL AND RECONSTRUCTION OF STEEL PLATE / 17 023403 10.000 EACH GUIDEPOSTS, REMOVAL AND RESETTING OF / Section 02 Total $40.00 Section 03 AA1 GUARDRAIL END TERMINAL ALT (MGS-MSKT) 18 030558 2.000 EACH GUARDRAIL END TERMINAL (MGS-MSKT) /