Engineering and design services for a 10” high-density polyethylene culinary water transmission pipeline, roughly 3,700’ in length, between existing waterline segments in the Alta Ski Area (ASA) Albion and Wildcat base areas. Roughly 3,300’ of the waterline is proposed to be installed in a trench being excavated by ASA along an existing utility corridor, in which ASA will install two 42” diameter HDPE snowmaking water storage pipelines and two 8” diameter steel snowmaking water transmission pipelines. The Town will be solely responsible for excavation, backfill, revegetation, and/or repaving of 16 segments extending beyond ASA’s trench. A pressure reducing valve may need to be installed along the Town’s proposed waterline.