Specifications include, but are not limited to: The HCDA requires the services of a construction contractor (hereinafter “Contractor”) to furnish and perform the construction services necessary to restore the full functionality and visual aesthetics of an active, in-service public storm water catch basin (hereinafter the “Project”) on the Premise. The storm catch basin is part of and connected to a public stormwater collection system. The concrete structure is believed to have been damaged by an overweight vehicle and/or prematurely spalled in localized sections due to misplaced rebar during initial construction resulting in insufficient concrete coverage. The Contractor shall be solely responsible for applying for, picking up, and paying for all necessary permits and fees needed to complete the Project. This includes, but is not limited to all: State of Hawaii permits, City and County of Honolulu permits, public utility connection fees, and service fees.