Specifications include, but are not limited to: 1. The proposal must identify the cost for all non-recurring expenses, including but not limited to construction of conduit, trenching, campus assessment, engineering, project management, documentation, contingency, installation, configuration, travel, taxes, etc. Offeror must include all costs to extend to their service to the MDF at each site or location designated by the district. The Offeror must obtain and pay for all permits and inspections required by all legal authorities and agencies having jurisdiction for the work. 2. The proposal must include a cost for the Minimum Bandwidth, the Maximum Bandwidth, and each Incremental Bandwidth denomination specified between the Minimum and Maximum Bandwidth. For example, a Minimum Bandwidth of 100 Mbs and a Maximum Bandwidth of 500 Mbs with an Incremental Bandwidth of 100 Mbs will require pricing for 50 Mbs, 100 Mbs, 200 Mbs, 300 Mbs, 400 Mbs, and 500 Mbs levels of Bandwidth. 3. Contract must allow for upgrades to quoted bandwidths.