OR8 Corridor Safety & Access to Transit II Project on the Tualatin Valley Highway (Rt. No. OR8) in Beaverton. Req. approx. 1,200 ft2 temp. signs; 2 ea. PCMS; 250 hr flaggers; 2 ea. TMA; 850 ft2 temp. walks; 80 ton contam. soil disp.; const. surv. work; 71.4 yd3 gen. exc.; 139 yd2 CPPR; 83 ton aggr. base; 26 ton ACP; 317.8 ft conc. curbs; 380 ft2 conc. island; 1,300 ft2 conc. walks; 5 ea. curb ramps; 58,000 ft thermo. pvmt. marking; 510 ft2 pvmt. bar; 1,800 ft2 green preform. thermo. film; 95.2 ft2 signs; pole foundations; lum., lamps, ballasts; switch., conduit, wiring; lighting poles & arms; flashing beacon install.; unintegrated speed feedback assembly; 130 ft CL fence. This project requires Railroad Insurance.