5,400 square foot building; Framing Roughly 340’ of 9’ walls. Plumbing Rough in and trim out of 12 plumbing fixtures. Install new toilets, wall hung sinks, Kitchen sink, water line for ice maker. Install existing water heaters. Sheetrock Install sheetrock on all new walls, patch and skim all existing wall sections that will remain. Materials and Labor to hang, tape, and finish. Cabinet install Install Cabinetry in Kitchen; Doors/Hardware Install Door, Hardware, Bath accessories, grab bars, etc… Concrete Saw cut to expose plumbing, demo, prep, and pour back. Flooring 5,580sqft of VCT, and 4” rubber base throughout entire building. Electrical Install all new runs for plugs, switches, lighting, water heaters; Ceiling grid and tiles Install all new ceiling grid and tiles (2 x 4); Paint Paint all interior