furnishing all labor, skill, equipment, materials and products as indicated in the plans and specifications for the installation of Storm drainage improvements along Chapel Crossing Road and inside the Federal Law Enforcement Training Center (FLETC) to include concrete storm pipe, structures and box culvert and sidewalk as indicated on the plans. All work within the FLETC will be coordinated with FLETC and all contractor personnel must complete FLETC FORM 121-00-02 (FLETC VISITOR & VENDOR ACCESS REQUEST) and pass the corresponding security and background checks to be permitted access to the facility to complete the work within the FLETC facilities. The work will consist of, but is not limited to traffic control, safety procedures, flagging, clearing and grubbing, borrow, grading, dewatering, backfilling , grassing, storm drain installation concrete sidewalk installation and erosion control.