The successful proposer shall provide the following services at a minimum: 1. A Study of the Existing Plant: a) Perform a study of the existing plant to provide infrastructure upgrade recommendations as well as process improvement recommendations in order to add at least 1.0 MGD permitted treatment capacity utilizing the existing plant’s location and footprint. The plant must remain operational during the construction of said upgrades. b) Present results of the analysis in an engineering report. At a minimum, the report shall include a narrative describing: investigation methodology, summary of the collected data, exhibits, calculations, and the conclusions of the analysis. c) Present and discuss project construction timeline and how the recommended alternatives can be constructed and brought on-line while maintaining the operation of the current facility. d) Identify both operational and unit process improvements or modifications to increase the reliability of the facility to meet current and projected wastewater treatment requirements. Identify improvements to maximize hydraulic treatment capacity while minimizing capital costs. e) Prepare a facility optimization and planning document, proposing operational changes, minor facility upgrades, and capital improvements to the Georgetown WRF that will enable the City to increase the facility’s permitted capacity. This report should also include engineers’ cost estimates...