1.05 SYNOPSIS In general, work consists of any of the following and blacking out all existing conflicting striping, arrows, and signage before any seal coat is applied. It is the Contractor’s responsibility to verify all dimensions that are applicable, to be discussed at mandatory walk through. A. Sq. Ft. Skin Patch (S/P) B. Sq. Ft. Asphalt Fabric Over/Lay (O/L) C. Sq. Ft. Asphalt Remove and Replace (R & R) D. Sq. Ft. Concrete Repair (CR) E. Entire Parking Lot Sq. Ft. Asphalt Seal Coating (AS) F. Formula (ASPC) Asphalt Seal Prime Coat G. Formula (AS-1) Asphalt Seal 1st Coat H. Formula (AS-2) Asphalt Seal 2nd Coat I. Formula (AS-3) Asphalt Seal 3rd Coat J. Lin. Ft. Rubberized Crack Filler (CF) K. Lin. Ft. Line Striping or as existing L. Number of Handicapped Parking Stalls (per Title 24 & ADA Handicapped Specifications) M. ______ Other (see notes on plans) N. ______ Excavation Depth O. Number of oil spots to be ground P. Number of wheel stops to replace 1.06 PATCHING Severely degraded areas are to be repaired by removing and replacing the asphalt. These areas are not yet indicated on the copy of the site plan, and will be verified by the CHP Facilities Coordinator at the pre-bid conference. 1.07 EXCAVATION FOR REMOVE AND REPLACE Pavement will be saw cut neatly and squarely and in straight lines. Contractor shall excavate pavement to a depth sufficient to remove damaged asphalt and degraded base material. Remove all excavation material from the premises.