Provision The Vendor must provide all supervision, tools, equipment, hardware and wiring materials as specified; transportation, erection, construction, unloading, inspecting, and keeping inventory as specified in attached contract documents. Whenever in the Contract the terms "provide, furnish, supply, install, etc.,” can be interpreted as requiring the Vendor both to furnish and/or install materials, unless specific provisioning/installation of the materials by The District is denoted. Firewalls Provide for the installation of all conduits and sleeves through firewalls and application of fire-stopping materials as required to meet codes. Ceiling Tiles Provide for the removal and reinstallation of all ceiling tiles as needed. Any broken ceiling tiles will be replaced with equal or better quality of the damaged ceiling tiles. Identification The Vendor will identify to the district any work necessitating cutting into or through any part of the building structure such as girders, beams, concrete, tile floors or partition ceilings. Permits The Vendor shall obtain all necessary county, municipal, and/or state work/building permits. This includes any permits that may be needed to gain the right of way for outside cabling.