A. Retrofit existing counter to accommodate new level 3 ballistic glass. If counter cannot be retrofitted, then existing counter must be demolished, and a new counter installed. B. Install new level 3 ballistic glass panels with matching level 3 aluminum framing in lobby. C. Install new level 3 bullet resistant door and paint as needed. D. Install electronic door entry device. E. Install stainless steel pass-through trays at the openings in glass cutouts, and voice holes in glass. F. Install Kevlar sheeting around entire lobby walls to prevent bullet penetration. G. Furnish all new framing materials to support the glass panels and door as necessary. H. Ensure all framing members are attached to the roof structure above the ceiling for structural support of the new wall panels and door. I. Contractor shall warranty all work, labor, and material for a period of two (2) years. J. Remove all debris, including packaging material off-site on a daily basis...