Grading, Drainage, Paving, Striping, Signing, Illumination, Signals & Roadside Development. 1 ON THE JOB TRAINING 0100 450 HR $20 $9,000 2 MOBILIZATION 0210 1 LS 3 TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC 0221 1 LS 4 SEQUENTIAL ARROW SIGNS 0222 7 EACH 5 PORTABLE CHANGEABLE MESSAGE SIGNS 0222 6 EACH 6 TEMPORARY SIGNS 0222 711 SQFT 7 FLAGGERS 0223 540 HOUR 8 TRAFFIC CONTROL SUPERVISOR 0223 1 LS 9 FLAGGER STATION LIGHTING 0223 3 EACH 10 SURFACE MOUNTED TUBULAR MARKERS 0224 320 EACH 11 TEMPORARY PLASTIC DRUMS 0224 38 EACH 12 TEMPORARY BARRICADES, TYPE II 0224 63 EACH 13 TEMPORARY BARRICADES, TYPE III 0224 37 EACH 14 STRIPE REMOVAL 0225 12850 FOOT 15 LEGEND REMOVAL 0225 560 SQFT 16 CHANNELIZING DEVICES 0228 2960 FOOT 17 TEMPORARY CURB RAMP, CONSTRUCTED 0228 16 EACH 18 TEMPORARY WALKS 0228 113 SQFT 19 TEMPORARY TYPE CL-6R CHAIN LINK FENCE 0270 337 FOOT 20 EROSION CONTROL 0280 1 LS