The work for the PLEASANT/HODGKIN/QUIMBY STREET WATER MAIN REPLACEMENT & ROAD REHAB shall consist of, but not be limited to, the complete and satisfactory construction of installation of: Water Main - 1,020 LF of 12” Dia. DI Water Main - 100 LF of 6” Dia. DI Water Main - 340 LF of 2” Fusible HDPE Water Main - 3 Hydrant Installations - 320 LF of ¾” Copper Water Services - 600 CY Aggregate Base - 1,000 CY Aggregate Subbase Paving - 500 Ton of Machine-Placed 12.5mm HMA Surface Course - 900 Ton of Machine-Placed 19mm HMA Base Course - 100 Ton of Hand-Placed HMA - 5,700 SY of Pavement Removal - 1,600 SY Loam, Seed & Mulch Stormdrain - 1,600 SF 2” Rigid Insulation - 39 LF 36” Solid Pipe (SDR35 PVC or ADS N-12 Dual Wall) - 195 LF 15” Solid Pipe (SDR35 PVC or ADS N-12 Dual Wall) - 2, 4-ft Dia. Catch Basins - 2, 6-ft Dia. Catch Basins Sewer Main - 420 LF 8” Solid SDR35 PVC Pipe - 60 LF 4” Solid SDR35 PVC Pipe (New Main Lateral Connections) - 20 VF, 4-ft Dia. Manhole - 30 VF, 4-ft Dia. Doghouse Manhole