1) Roofing –Division 7 (House Roof Alternate 1) A. Remove existing roofing up to two layers, gutter & leaders on home and shed and dispose of properly. a. Replace degraded sheathing ($90.00 allowance per sheet allowance) b. Photograph any rot damage to sheathing and then any replaced sheets and send to Housing Rehab Specialist before roofing c. Provide and install first two courses with Ice and Water Membrane per GAF requirements (low sloped roofs between 2.12 and 4.12 pitch to be entirely covered with Ice and Water Membrane d. Install new lifetime architectural asphalt shingles manufactured by GAF on pitch greater than 2.12 and GAF Liberty SBS self-adhering cold applied asphalt roofing on low slope roofs less than 2.12 pitch e. Provide and install aluminum “drip” and “rake” edge flashing f. Replace all vents g. Color to be chosen by owner from manufacturers standard pipe and ventilation flashing systems, including but not limited to waste vents, bathroom, range and dryer ventilation h. Install new continuous ridge vent per GAF requirements i. Verify soffit ventilation, install vents as needed j. All work to be performed per building code requirements k. Refer to specifications for all work 2) Flooring A. Provide and install new vinyl resilient plank flooring in the kitchen, hallway, all closets and living room, bathroom and bedrooms. a. Relocate appliances to install flooring; refrigerator, range & dishwasher b. New flooring shall be installed under the appliances c. Provide and install new vinyl resilient plank flooring (uni click) d. Manufactured by Traffic Master Allure Ultra e. Owner to choose color and style, maximum $3.70/S.F. material allowance f. Provide all necessary transitions or terminations a) The contractor shall custom make oak transitions at the existing dining room hardwood floor to minimize trip hazard b. Install new paint grade base board and (door casing if required), match existing c. Install new toe kick at kitchen cabinets B. Refer to manufacturer specifications for all work 3) Windows- Division 7 A. Remove existing double hung window located at “A-D” façades. a) 7 total DH windows. b) Verify size c) Paint or stain new or disturbed work d) Install insulation in cavities and caulk all edges e) All windows to be manufactured with energy star glazing package. f) All units to be white g) All operable units to include full standard fiberglass mesh screens h) Refer to specifications for additional information i) All work to be performed to code requirements