A. It is the intent of this project to pressure test, chlorinate and bacteria test the installed waterlines, replace drain lines, reset granite curbs and remove and reconstruct the streets specified in the proposal B. Removal and reconstruction work shall be accomplished in accordance with the construction documents and shall include but is not limited to the following: 1. Installing drainage, and tie in water main system. 2. Removing and replacing pavement. Hauling and legally disposing of existing pavement and surplus materials from the project site. 3. Constructing new concrete curbs or curbs and gutters and resetting granite curbs. 4. Constructing asphalt pavement or Portland cement concrete pavement. 5. Replacing concrete sidewalks and driveway aprons. 6. Constructing concrete handicap ramps at locations shown on the plans. 7. Adjusting utility structures to grade. 8. Other work incidental to the project. 9. Any remaining work observed from the RR183-Treme-Lafitte Group B project. C. The Director reserves the right to reduce, delete or increase the quantity of any item in the proposal.