1. Mobilize crew and equipment 2. Provide divers, if necessary, to access wet pit for the suction bell assembly. 3. Isolate and drain water from wet pit as necessary to complete scope. Install stop logs, drain pump pit, remove debris from pit, install suction bell, remove stop logs. 4. Disconnect stabilizer bar from pump in pit. 5. Remove catwalk, piping, and accessories, as necessary, to remove pump from pit for disassembly 6. Complete disassembly of the pump. 7. Inspect pump shaft run outs, critical register fits, bearing fits 8. Provide and install new shaft sleeves where needed 9. Manufacture (2) new cutlass bearings 10. Provide (1) radial steady bearing 11. Install new bearings 12. The clearances shall be checked before assembly. 13. During assembly the SWBNO Machine Shop authorized person will review the work at various inspection points and sign off. See form in Appendix B, “SWBNO Rotating Equipment Acceptance” form. Contractor shall communicate with SWBNO to arrange the inspections. 14. Existing grease lubrication piping shall be inspected, repaired, flushed, and cleaned. 15. Assemble/reinstall pump 16. Install 4” Pipe Pump Stabilizers in pump pit. Modifications to current design shall be approved by engineer. 17. Install right angle gear drive. 18. The power leads to the motor will be connected by the owner's facility maintenance team. 19. Complete balance of all systems functional testing, oil flushing, start-up, and commissioning. Furnish turnover packages. 20. Commission and startup pump to ensure satisfactory operation 21. Clean area and pump pit of all discarded materials