Specifications include, but are not limited to: 5.1.1 (a) Demolition and disposal of the existing residence including awnings, site concrete, hardscape and landscape necessary to provide the new residence. 5.1.1 (b) Earthwork and Building Pad. 5.1.1 (c) Site landscape, hardscape, grading, antennas, fencing etc. 5.1.1 (d) Existing utilities shall be disconnected, protected and preserved, rerouted and/or replaced as necessary and connected to the new house. Provide 200 AMP electric service. All utility company fees and permits are the responsibility of the contractor. 5.1.1 (e) Coordinate with utility companies for disconnect and reconnect services, modifications and permits. Permits and fees are paid by the contractor. 5.1.1 (f) Site plans and grading plans are not available. The contractor shall develop and provide such plans as/if needed to perform the work. 5.1.1 (g) Provide engineered foundations design and construction when site conditions require an engineered solution.