7.1. GENERAL CONDITIONS ***This remodel must be complaint with the 2010 ADA Standards for Accessible Design*** A. Provide building permit. B. Provide Payment and Performance Bonds. C. Provide general liability, worker’s compensation, and auto insurances. D. Provide Builder’s Risk insurance policy. E. Provide construction dumpster for all demolition materials. F. Provide onsite superintendent. 7.2. DEMOLITION A. Demo current toilets, partitions, and accessories. B. Demo plumbing. C. Demo (1) hollow metal door in each bathroom. (Main entry door) D. Demo vanity. E. Demo existing tile F. Demo ceiling mounted electric heaters G. Demo all light fixtures, switches, receptacles, exhaust fan grilles, and horn/strobe. 7.3. HOLLOW METAL DOORS A. Install (1) new hollow metal door in each restroom with hardware to include lockset, threshold, weather-stripping, closer and kickplates. 7.4. ACOUSTICAL CEILING A. Install new 2x2 acoustical ceiling at 10’ B. Grid will be 15/16” 7.5. FLOOR COVERING A. Install ceramic tile in the floors of both bathrooms and 6’ high on the walls. B. Slope the floor around the floor drain. C. Epoxy grout