a. The intent of the project is to demolish and replace the existing nominal 500 ton, two cell, counterflow Cooling Tower (CT-1). The new Cooling Tower shall be of equal capacity as the existing. The new Cooling Tower is to be fabricated to be a direct replacement of the existing Cooling Tower with accessory upgrades. b. Demolition work shall include the removal of the existing Cooling Tower and portions of the associated above-ground condenser piping. c. The electrical scope shall include the modification of the power supply for connection to the replacement Cooling Tower, associated basin heaters and heat trace. d. The BAS controls sequence of operations and points shall remain the same as currently programmed by Convergint. Convergint shall provide the same sequence of operations and points for all new and existing equipment.