Consisting of removal of 2 underground fuel storage tanks and installation of 1 dual product underground fuel storage tank, removal and replacement of existing underground fuel lines, installation of new fuel dispensing station and electrical/mechanical lines and controls, installation of fuel pumps, removal/replacement of the concrete slab over the underground fuel tanks, installation of a new concrete slab at the new fueling dispenser, removal/replacement of pavement/sidewalk/curb & gutter, installation of sheet piles during construction, re-grading the site, import of structural section shown on the Drawings, installation of one concrete island with steel forms, removal/replacement of bollards/signs, installation of traffic markings, design/installation of a canopy/canopy pile foundations, installation of curb ramp, installation of storm drain pipe to connect to proposed canopy roof drain, connection to existing storm drain system, excavation/disposal of contaminated soil, dewatering contaminated groundwater and other miscellaneous items as shown on the Drawings.