The new facility shall be an approximately 4,800 SF metal building and should also include: 1) Two (2) rooms, one for equipment storage (10’x15’), and one for oxygen storage (8’x8’) 2) Two (2) entry/exit bay doors. The bay shall have two 14 ft. wide by 12 ft. high power operated overhead door. Doors shall be insulated steel sectional doors, with one section containing vision panels at eye level. 3) Two personnel entrance/exit doors. One at the front and one at the side/rear. 4) Provide metal liner panels on interior walls of bays. Panels shall extend from floor level to 8’-0” above finished floor. 5) Exhaust fan with replacement air shutters (ventilation per code requirement). 6) Heating: the vehicle bay shall be heated via natural gas fed infrared tube heater with a tube length determined by the manufacturer for the recommended square footage. 7) Provide at least one floor drain per vehicle in bays (for washing). 8) Electrical: In addition to lighting and outlets as required by code and convenience, the bay shall contain one overhead electrical drop located as directed by theowner. 9) Indoor water spigot (enough to facilitate washing multiple vehicles simultaneously). 10) An approximately 10’x15’ storage room...