The project is to provide LED lighting upgrades within Desert Inn Tunnel, and Wall Pack lighting upgrades on Desert Inn Road between Paradise Road and Joe W. Brown Drive/University Center Drive. The improvements generally consist of pavement rehabilitation, cold planning and overlay, plantmix bituminous paving, median, pavement markings, signing, traffic signal improvement, utility adjustments, construction traffic control and other related items of work. The work includes demolition, removals and disposal of designated improvements including bituminous pavement, concrete structures, lighting, signage, and other related items of work. Also, including a Pedestrian Actuated Flasher at Convention Center Drive and Channel 8 Drive. These improvements generally consist of the installation of curb and gutter, concrete sidewalk, concrete sidewalk ramps, cross gutter and spandrel, pavement markings, permanent signs and maker posts, splicing and wiring to the existing conduits, in place and operational, and other related items of work as specified and shown on the drawings.