The project includes all material, labor, and related appurtenances for complete installation of a gravity sewer system as indicated on the construction drawings. The project involves sewerline replacement of existing sewer with 10” PVC and HDPE. This work will include the replacement of approximately 3,040 Linear Feet (LF) of 8” & 10” gravity sewer line via pipe bursting, 573 Linear Feet (LF) of 8” gravity sewer with 10” PVC via open cut installation, 112 Linear Feet (LF) of 8” gravity sewer with 10” DIP via open cut installation, 9 manholes, approximately 14 service laterals, approximately 10 manhole invert replacements, and all related work to be installed to serve residents along Bruce Street and Davis Drive in Adairsville, Georgia. This work also requires bypass pumping and approximately 400 Square Feet (SF) of Asphalt Pavement Repair.