A. The scope of work presented in the Contract Documents includes but is not limited to the following: • Mobilizing to the site. • Installing, monitoring, and maintaining erosion and sedimentation controls. • Establishing suitable construction access roads and staging areas. • Installing temporary chain link fence. • Removing vegetation from work area and installing tree and vegetation protection for trees and other vegetation to remain. • Establishing dewatering/staging area(s) on-site. • Dredging sediment within pond area. • Transporting sediments to dewatering area. • Characterizing sediment for disposal/reuse. • Transporting and disposing of all dredge materials. • Loaming and seeding of disturbed areas. • Restoring site features including landscaping to their pre-construction conditions. • Removing erosion and sedimentation controls and temporary access improvements. • Demobilizing from the site.