The Two (2) 130 Gallon PVI Conquest 40 L 130A-GCML Gas Hot Water Heater must be new equipment and meet all specifications within the document that is set forth. C. Specifications The Gas Hot Water Boilers shall meet or exceed the following minimum requirements: 1. (2 ea) 130 Gallon Tank 399,000 Btuh Touch-Screen Operating Control Integral Tank Circulator Dedicated Hot Water Return Connection Low Standby Losses, Energy Star Certification Modulation Increases Efficiency and Reduces Cycling During Low Demand Multiple Positive-Pressure Venting Options Pressure Vessel and Heat Exchanger Burner, Operating and Safety Controls Removal and Installation: 1. Disconnect power and control wiring 2. Disconnect gas lines, water lines, combusting air piping and flue piping 3. Demo and remove the existing two water heaters 4. If needed, all plumbing, electrical or exhaust changes but not limited to must be new and installed according to manufacture requirements. 5. Cap any abandoned conduit and piping. 6. When fixtures requiring plumbing connections are furnished, contractor shall furnish and install carriers, “P” trap and stops and make final plumbing connections. 7. Do not route any new water supply piping above electrical panels. 8. Kentucky Department of Corrections Standard shall be followed unless otherwise noted. 9. Refer to the security wall type plan G-102 for re-inforcing requirements within masonry walls. 10. Connect power and control wiring 11. Start systems and check operations