This project shall include the full replacement of two existing roof sections and concerned roof elements including installation of new lightning protection. The current exterior EIFS/building envelope is not in good condition and will need to be assessed to determine whether rehabilitation or replacement is required around whole perimeter of the terminal including the bridge connecting the two different building sections of the terminal. Rehabilitation of the EIFS at the bridge might also require replacement of the old LEDs with the new ones and installation of new access panels underneath the bridge. There are two (2) escalators (#1 & #2) that have obsolete components, and it is getting very difficult to find the components whenever any fix is required. Therefore, a full replacement of these escalators is required. An evaluation of replacement options is necessary. There are two elevators in the public area that are also old and will need to be assessed and evaluated for upgradation. These two elevators, (Elev.#1 & Elev.#3), may include more than just cab replacement. It can be overall modernization of all components associated, as found during an assessment by the elevator consultant which can include controller, machine room components, hoist way and it’s door equipment, fire code compliance, communication systems, hydraulic pumping unit, modifying oil line, etc., and bringing them up to current code.