•Milling and resurfacing •Widening of the southbound lane by two feet to accommodate two 11-foot lanes with four-foot buffer between the northbound and southbound lanes •Addition of five-foot shoulders (10’ Shoulders (5’paved) adjacent to widening) •Addition of southbound left turn lane at Bishop Road and River Road and relocating the entrance of the Little Manatee River Trailhead to Berry Grove Boulevard •Realigning Lightfoot Road intersection •Drainage work proposed to accommodate these improvements include a cross drain extension, side drain relocations, and the regrading and relocating of existing ditches. •Widening for keyhole bike lanes for the right turn lanes to Saffold Road and Bonita Drive. •Advanced side street signing with flashing beacons.