The Contractor shall provide all labor, materials, equipment and tools in order to prep and apply Epoxy to approximately 2,000 square feet of existing concrete gym floor. All work shall be performed during normal business hours: 7:00 AM – 3:30 PM Monday-Friday. The Contractor shall remove any old paint on the concrete with a large concrete grinder with dust extraction, and repair any cracks and spalls. The Contractor shall apply primer/sealer, ProRez ProPoxy Moisture Blok (MB) or equal, 100% solids epoxy primers to seal substrate. he Contractor shall scrape, vacuum any loose ProRez Propoxy Standard (S) or equal. The Contractor shall apply finish coat ProRez ProThane Standard (S) or equal, ultra-high solids, high performance urethane topcoat in satin finish. Flooring colors shall be F9908 Canary Yellow, F5910 JD green, and F1050 Black (or equal).